Team

Silvan Hofer

Managing Director / Head of Engineering

Graduate civil engineer and industrial engineer. Experienced overall project manager and chief engineer on a range of projects with over 15 years of experience.

SELECTED PROJECT REFERENCES

A selection of personal development and construction project references from a professional career, realised in previous roles and in the course of work with the companies named in each case.

  • Navigare Hotel Resort - Grand HotelOverall project manager - delivery - 77 apartments - CHF 70 million
  • New building Privatklinik Bethanien GEB C, Zurich2023–2025 · Overall project management and client support, general planning SIA 21–62 · CHF 10 million
  • BLS engineering structures (Heimberg tunnel, Schwäbis bridge, Meiggbach gallery)2025–2032 · Client representation (GPL), from design to completion (phases 31–53) · CHF 25.4 million
  • Rosenklinik, Rapperswil SG2022–2024 · Conversion of a private clinic with new operating theatres and patient rooms incl. building services · CHF 11 million
  • Klinik BelAir, Schaffhausen2022–2024 · Planning of a new private hospital, overall project management as Head of German-speaking Switzerland AEVIS/SMN, SIA 21–33 · CHF 39 million
  • Privatklinik Siloah, Gümligen2023–2024 · New patient rooms incl. building services, overall project management · CHF 1 million
  • VIVA Medical Centre, Bern2021–2023 · Overall project management, new build, general planning SIA 21–62 — incl. laboratory, resuscitation rooms, gastroenterology, radiology · CHF 16 million
  • New gastroenterology unit, Ostermundigen2022–2023 · Overall project management, SIA 21–62 — two endoscopy suites with sterilisation and washing facilities · CHF 3 million
  • New radiology unit, Ostermundigen2021–2023 · Overall project management, SIA 21–62 — MRI, CT, C-arm, X-ray, ultrasound with redundant building services · CHF 6 million
  • Alto Pont-Rouge, Geneva2020–2022 · Sub-project management, special engineering/prestressing — building complex with 35'000 m² · CHF 180 million
  • KSA Aarau, new building “Dreiklang”2018–2020 · Redesign and optimisation of construction processes · CHF 450 million
  • Refurbishment of Pont Lavapesson, Fribourg2017–2020 · Site management, complete refurbishment — use of prestressing and UHPC · CHF 20 million
  • SBB Lehnenviadukt, Killwangen2015–2017 · 340 m viaduct along the banks of the Limmat to separate the Bern/Basel–Zurich lines
  • Renewal of Tiefenaustrasse RBS, Bern2019 · Project management — replacement of the road cantilever and retaining wall above the RBS tracks · CHF 45 million
  • Refurbishment of the Rosshäusern tunnel, Bern–Neuchâtel2017–2018 · Project engineer, double-track expansion of the 3.7 km bottleneck · CHF 280 million