TeamRoy Lengweiler
Civil engineer · structural engineering
Graduate civil engineer, ETH Zurich. Over 30 years of major international projects in bridge and infrastructure construction — including Sheikh Zayed Bridge Abu Dhabi, Stonecutters Bridge Hong Kong and the Dubai Metro.
SELECTED PROJECT REFERENCES
A selection of personal development and construction project references from a professional career, realised in previous roles and in the course of work with the companies named in each case.
- Sheikh Zayed Bridge, Abu Dhabi2003–2012 · Deputy Project Manager · bridge by Zaha Hadid, construction cost approx. USD 300 million
- Stonecutters Bridge, Hong Kong2014–2016 · Engineering Manager · cable-stayed bridge, expert reports on balanced cantilever construction and cable adjustment
- Dubai Metro Expo 2020until 2017 · Engineering Manager, Rizzani de Eccher
- Rama VIII Bridge, Bangkok2000–2002 · Project Manager · asymmetric cable-stayed bridge, 300 m main span
- Wadi Leban Bridge, Riyadh1998–2000 · Deputy PM / Construction Manager · 405 m main span
- Barelang bridges, Indonesia1996–1998 · Technical Manager, VSL International